Maintenance work at the Artemisio Tunnel on the section of the national highway between Corinth and Tripoli in the Peloponnese, will result in south-bound traffic being redirected from Monday and until Friday and 4 p.m.

Trucks carrying hazardous materials will not be allowed to travel through the tunnel between 9 a.m. and 8 p.m.